-3749
Property | Specification |
Data System | MDS |
Data Specs | V2.00.1 |
Edit Type | Consistency |
Severity | Warning |
Edit Text |
Date Span Requirements The following rules describe allowable spans between pairs of dates. Each rule applies if both date items in the pair are active and contain valid dates (not dashes or other special values). Violation of these rules will result in warnings. a) Z0500B (completion date) - A2300 (assessment reference date) <= 14 days. b) If A0310A is equal to [03,04,05], then V0200B2 (CAA process signature date) - A2300 (assessment reference date) <= 14 days. c) V0200C2 (CAA care plan signature date) - V0200B2 (CAA process signature date) <= 7 days. d) If A0310A is equal to [01], then Z0500B (completion date) - A1600 (entry date) <= 13 days. e) If A0310A is equal to [01], then V0200B2 (CAA process signature date) - A1600 (entry date) <= 13 days. |
Version Notes |
Item List | |
Item ID | Description |
A0310A | Type of assessment: OBRA |
A1600 | Entry date (date of admission/reentry in facility) |
A2300 | Assessment reference date |
V0200B2 | CAA-Assessment process signature date |
V0200C2 | CAA-Care planning signature date |
Z0500B | Date RN signed assessment as complete |
NOTICE: These materials are in the public domain and cannot be copyrighted.
Generated: 08/31/2016 09:05:46 AM